Lewati ke konten utama
Aktif

11.4.9. Building on brownfield sites

TPB 11: Sustainable Cities and Communities

University of Mataram Advances Brownfield Redevelopment through Campus Infrastructure Development

Mataram, Indonesia – Universitas Mataram (Unram) continues to strengthen the efficient use of its established campus land by integrating the redevelopment of previously built sites into its infrastructure development and asset-management planning. The University demonstrated this approach through plans to replace former official residences on Jalan Pemuda with new academic facilities, alongside the development of major laboratory and student-learning infrastructure within its existing campus complex.

Official University of Mataram site-planning documentation identifies campus polyclinic on the site subsequently redeveloped for new academic and healthcare facilities, demonstrating the University’s reuse of previously developed campus land.

Brownfield Redevelopment Embedded in Institutional Planning

The University’s commitment to redeveloping previously developed sites is explicitly documented in its 2025 Business and Budget Plan (Rencana Bisnis dan Anggaran/RBA). The document explains that Unram’s annual building development programme is coordinated with the formal removal of existing building assets when necessary.

In particular, the RBA states that the University’s planned 2025 development of shared lecture and laboratory facilities required the removal of former official residences (rumah dinas) located on Jalan Pemuda. This demonstrates that the redevelopment of existing built land is considered as part of the University’s infrastructure and asset-management decisions. The statement is significant because it links new construction with the reassessment and removal of existing buildings, rather than treating campus expansion solely as the development of additional land. The relevant policy is documented in the University of Mataram 2025 Business and Budget Plan, page 139.

Development of the Integrated Laboratory and Student Learning Center

A major infrastructure project during the reporting period is the construction of the Integrated Laboratory and Student Learning Center. Unram’s official 2025 procurement programme records this project as a major construction package. The technical documentation places the project within the established University campus complex on Jalan Pemuda, Mataram. It describes a five-storey facility comprising integrated laboratory and student-learning spaces, supported by a power house, mechanical and electrical systems, landscaping, and wastewater-treatment infrastructure.

The project was tendered in 2025, with the procurement process progressing towards contract implementation later that year. The University’s 2026 procurement information identifies the Integrated Laboratory and Student Learning Center as a continuing contract originating from the 2025 tender and still being implemented in 2026.

This project demonstrates Unram’s continued investment in higher-capacity academic infrastructure within its established campus area. When considered alongside the RBA’s explicit statement on removing former official residences for the 2025 development programme, it provides evidence of the University’s approach to accommodating new facilities through the reassessment and redevelopment of existing campus assets.

Campus Improvement and Infrastructure Reorganisation in 2025

The University’s infrastructure priorities were also reflected in a campus inspection conducted by the Rector on 14 February 2025. During the visit, the Rector reviewed areas requiring improvement, including the ongoing renovation of the Faculty of Animal Science building and preparations for a new building to the west of the Faculty of Medicine and Health Sciences.

The official report, “Rektor Unram Tinjau Lingkungan Kampus, Pastikan Fasilitas dalam Kondisi Optimal”, documents the University’s attention to maintaining, renovating, and developing facilities within its existing campus environment. It also illustrates the University’s continuing efforts to improve campus infrastructure and its supporting facilities.

Making Better Use of Existing Campus Land

Redeveloping previously built sites can contribute to more sustainable campus growth. By replacing ageing or underutilised structures with facilities serving broader academic and institutional needs, Unram can make more productive use of its established campus footprint.

This approach offers several potential benefits:

  • More efficient land use: New academic capacity can be accommodated on previously developed sites, reducing the need to rely exclusively on undeveloped land.
  • Better use of existing infrastructure: Established campus locations are generally connected to existing roads, utilities, drainage, and other supporting services.
  • Improved campus integration: New facilities can be located within the existing academic environment, supporting connections with teaching, research, and student services.
  • Renewal of ageing assets: Buildings that no longer meet institutional requirements can be replaced with facilities offering greater capacity and functionality.
  • More compact campus development: Intensifying the use of existing campus sites can help limit pressure for outward expansion.

These are potential planning benefits of brownfield redevelopment; the University does not claim that every project has independently quantified reductions in land consumption or environmental impacts.

TPB 11: Sustainable Cities and Communities